CURRENT PROJECTS
|
|


|
| |
Ground Floor - 4 Nos.
First Floor - 14 Nos
Second Floor - 14 Nos |
| |
Lift facility
White sanitary wares
Pest control treatment
24 hours water supply
Wider staircase with easy to climb steps
Loft in all the Bedrooms and Kitchen
PVC Sintex doors for bathrooms Toilets
Designed for maximum cross ventilation
No encumbrances: Eligible for all loans
Common parking space for two wheelers
Approved
by DTCP Chennai 88/2009
Vitrified Tile Flooring 2' * 2' for the entire carpet area
Very Near to Srirangam Railway Station and Bus Stand
Car Parking space at additional cost.
Three
phase power supply.
Hot water pipeline and provision for installation of water heater for both bath rooms
Promoters adopting the present plan reserve the rights for minor changes, if any during the course of construction.
Intercom
Facility
Genset
backup |
|
|